Title: Modernwind turbines capacity utilization in real conditions
Other Titles: Використання потужності сучасних вітрогенераторів у реальних умовах
Authors: Покровський, Костянтин
Маврін, Ольгерд
Музичак, Андрій
Олійник, Володимир
Pokrovskyi, Kostiantyn
Mavrin, Olgerd
Muzychak, Andriy
Oliinyk, Volodymyr
Affiliation: Національний університет “Львівська політехніка”
Lviv Polytechnic National University
Bibliographic description (Ukraine): Modernwind turbines capacity utilization in real conditions / Kostiantyn Pokrovskyi, Olgerd Mavrin, Andriy Muzychak, Volodymyr Oliinyk // Energy Engineering and Control Systems. — Lviv : Lviv Politechnic Publishing House, 2017. — Vol 3. — No 2. — P. 47–50.
Bibliographic description (International): Modernwind turbines capacity utilization in real conditions / Kostiantyn Pokrovskyi, Olgerd Mavrin, Andriy Muzychak, Volodymyr Oliinyk // Energy Engineering and Control Systems. — Lviv : Lviv Politechnic Publishing House, 2017. — Vol 3. — No 2. — P. 47–50.
Is part of: Energy Engineering and Control Systems, 2 (3), 2017
Issue: 2
Volume: 3
Issue Date: 10-Nov-2017
Publisher: Lviv Politechnic Publishing House
Place of the edition/event: Lviv
Keywords: вітрогенератор
вітростанція
час використання встановленої потужності
коефіцієнт використання встановленої потужності
wind turbine
wind station
time of use of installed capacity
coefficient of utilization of installed capacity
Number of pages: 4
Page range: 47-50
Start page: 47
End page: 50
Abstract: Розвиток національної вітроенергетики в Україні стикається з низкою проблем через відсутність у достатніх обсягах інформації про особливості режимів роботи вітростанцій в реальних умовах. Це стосується показників вітрових навантажень у різних регіонах, оцінки продуктивності вітрових електростанцій з різнотипними вітрогенераторами. Однією з важливих характеристик потенційних можливостей роботи вітростанції в енергосистемі є час та коефіцієнт використання встановленої потужності, що широко застосовуються в задачах проектування електростанцій. Наведено результати розрахунку характеристик потенціалу виробництва вітроелектростанцій з генераторами різного типу та потужності, що визначено у вигляді часу та коефіцієнта використання встановленої потужності. Показано, що такі характеристики вітростанції однозначно характеризують ефективність застосування конкретного вітрогенератотра в реальних умовах для використання в проектних розрахунках.
The development of the national wind power industry in Ukraine faces a number of problems because of the lack of sufficient information on the peculiarities of the operating modes of wind farms under real-life conditions. This applies to wind load indices in different regions, estimates of the performance of wind power plants with different types of wind turbines. One of the important characteristics of the potential capabilities of a wind power plant in the grid is the time and rate of utilization of installed capacity (installed capacity utilization factor – ICUF), which are widely used in the design of power plants. The paper presents the results of calculating the characteristics of the production potential of wind power plants with generators of different types and capacities, which are defined in terms of time and coefficient of utilization of the installed capacity. It is shown that such characteristics of the wind power station uniquely characterize the efficiency of the application of a specific wind generator in real conditions for use in design calculations.
URI: https://ena.lpnu.ua/handle/ntb/42605
Copyright owner: © 2017 The Authors. Published by Lviv Polytechnic National University
URL for reference material: http://bp.com/statisticalreview
http://saee.gov.ua/uk/content/informatsiyni-materialy.htm
http://www.uself.com.ua/fileadmin/documents/USELF-Launch_Event_
References (Ukraine): [1] BP Statistical Review of World Energy, June 2016. http://bp.com/statisticalreview.
[2] 24 hour without coal. NG Control Room (@NGControlRoom), 22 april 2017.
[3] China reaches 150 GW of installed wind power capacity (2016). © Enerdata sas, 6 Feb 2017
[4] Information on capacity and volumes of electricity production by renewable energy companies operating under the green tariff (as of 01.01.2017). Derzhenergoefektyvnist, Ukraine ©2009. http://saee.gov.ua/uk/content/informatsiyni-materialy.htm. (in Ukrainian)
[5] Mark Z. Jacobson, Mark A. Delucchi, Zack A.F. Bauer etc. 100 % Clean and Renewable Wind, Water, and Sunlight All-Sector Energy Roadmaps for 139 Countries of the World. JOUL, Volume 1, August 23, 2017. © 2017 Elsevier Inc.
[6] Getting Wind and Solar onto the Grid. A Manual for Policy Makers. International Energy Agency.© OECD/IEA, 2017. р.69.
[7] Pokrovsky K., Kuzhelev M. Estimation of efficiency of a wind power plant on the data from open sources. // Bulletin of the National University “Lviv Polytechnic”, No. 862. “Electric Power and Electromechanical Systems”. – Lviv, view. NU “Lviv Polytechnic”, 2016. – P. 87–91. (in Ukrainian)
[8] “3 MW platform”. Vestas Wind Systems A/S, 2016.www.vestas.com.
[9] Gamesa platform catalogue. © Gamesa Electric. August 2016. www.gamesacorp.com.
[10] ENERCON product overview. © ENERCON GmbH. August 2016. www.enercon.de.
[11] WPP “Stary Sambir-1” nature does nothing in vain. http://www.uself.com.ua/fileadmin/documents/USELF-Launch_Event_ Kozytskyi_eng_140627.pdf.
References (International): [1] BP Statistical Review of World Energy, June 2016. http://bp.com/statisticalreview.
[2] 24 hour without coal. NG Control Room (@NGControlRoom), 22 april 2017.
[3] China reaches 150 GW of installed wind power capacity (2016). © Enerdata sas, 6 Feb 2017
[4] Information on capacity and volumes of electricity production by renewable energy companies operating under the green tariff (as of 01.01.2017). Derzhenergoefektyvnist, Ukraine ©2009. http://saee.gov.ua/uk/content/informatsiyni-materialy.htm. (in Ukrainian)
[5] Mark Z. Jacobson, Mark A. Delucchi, Zack A.F. Bauer etc. 100 % Clean and Renewable Wind, Water, and Sunlight All-Sector Energy Roadmaps for 139 Countries of the World. JOUL, Volume 1, August 23, 2017. © 2017 Elsevier Inc.
[6] Getting Wind and Solar onto the Grid. A Manual for Policy Makers. International Energy Agency.© OECD/IEA, 2017. r.69.
[7] Pokrovsky K., Kuzhelev M. Estimation of efficiency of a wind power plant on the data from open sources., Bulletin of the National University "Lviv Polytechnic", No. 862. "Electric Power and Electromechanical Systems", Lviv, view. NU "Lviv Polytechnic", 2016, P. 87–91. (in Ukrainian)
[8] "3 MW platform". Vestas Wind Systems A/S, 2016.www.vestas.com.
[9] Gamesa platform catalogue. © Gamesa Electric. August 2016. www.gamesacorp.com.
[10] ENERCON product overview. © ENERCON GmbH. August 2016. www.enercon.de.
[11] WPP "Stary Sambir-1" nature does nothing in vain. http://www.uself.com.ua/fileadmin/documents/USELF-Launch_Event_ Kozytskyi_eng_140627.pdf.
Content type: Article
Appears in Collections:Energy Engineering And Control Systems. – 2017. – Vol. 3, No. 2

Files in This Item:
File Description SizeFormat 
2017v3n2_Pokrovskyi_K-Modernwind_turbines_capacity_47-50.pdf231.19 kBAdobe PDFView/Open
2017v3n2_Pokrovskyi_K-Modernwind_turbines_capacity_47-50__COVER.png428.35 kBimage/pngView/Open
Show full item record


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.